BRS Consultant
Shotaro Tsubaki
Industrial & Life Science
NEW
Job number: JN -012026-199199
Posted: 2026-01-19
大型GTCC発電プラント向けガスタービン発電設備におけるエンジニアリングおよびマネジメント
ガスタービンに関わるEPCプロジェクトのエンジニアリング経験が活かせます。
9 - 14 million yen
Tokyo
Energy / Environment / EPC (Oil & Gas)
Project Management
Job details
- Company overview
- We are a comprehensive heavy industrial manufacturer operating in a wide variety of industrial fields. We primarily provide products and services in the aerospace, defense, energy, plant, and social infrastructure sectors. Leveraging our engineering capabilities and technological innovation, we design and manufacture advanced machinery and systems, contributing to the sustainable development of society. In addition, to address environmental issues, we are actively promoting the use of eco-technologies and renewable energy to solve the problems of society as a whole.
- Responsibilities
-
- 技術だけでなく様々な角度から検討を行い、ガスタービン発電設備およびその構成機器・周辺機器における基本計画を立案
- 顧客からの要求仕様に沿った条件における見積り・仕様書の作成、取りまとめおよびメーカー(GE社)との交渉や調整
- 契約内容および顧客の要求に基づいたガスタービン発電設備および、その構成機器を含めた仕様を取りまとめ、各メーカーへ仕様書を提示
- 建設・工事における監理業務(基本的に豊洲にて勤務し、イレギュラー対応や試運転フェーズ時には出張ベースで現場へ赴くことがあります)
- Requirements
-
必須条件:
- ガスタービンに関わるEPCプロジェクトのエンジニアリング経験(大型コジェネ・石炭火力等でもGE製のGT等を扱ってきた経験があれば可)
- 海外メーカーを始めとしたステークホルダーとのタフな折衝を取りまとめた経験
- ビジネスレベルの英語力(TOEIC(R)テスト700点以上目安)
- GE社製品を取り扱った経験、及びGE社とのコミュニケーションを行った経験をお持ちの方
- 構成機器や電気設備における電気系統に関わる専門知識をお持ちの方
- Salary
- 9 - 14 million yen
- Location
- Tokyo